Projects

Fabrication projects across India.

The 31 completed and 13 ongoing bridge girder works in the company’s register, placed on a map of India and listed in full below, with each division’s own projects page linked at the end.

Where we have worked.

All 44 works

Completed works (31)

Andhra Pradesh

Assam

Bihar

Chhattisgarh

Jharkhand

Odisha

Uttar Pradesh

West Bengal

Ongoing works (13)

Andhra Pradesh

Bihar

Chhattisgarh

Jharkhand

Odisha

West Bengal

Bridge girder works, completed and ongoing.

From the company’s register of railway spans: the foot overbridges, road overbridges and bridge girders fabricated by Metal Craft, on works of zonal railways, railway undertakings and state bodies.

Metal Craft Engineering of Kolkata keeps a register of its railway bridge works. It lists 31 completed works on 27 projects (some projects have more than one entry): 16 foot overbridge (FOB) works, 8 road overbridge (ROB) works, 6 girder bridge works and one plate girder regirdering job. They lie in seven railway zones: Eastern, South Eastern, Northeast Frontier, East Coast (now South Coast), North Central, South Western and East Central. They also include works of RITES, NMDC, the Indian Port Rail & Ropeway Corporation and the Assam Public Works Department. Years of execution run from 2018-19 to 2026-27. The ongoing works are listed after the completed ones in each group. Each row below names the railway or body that owns the bridge, with the girders listed under it.

For railway works, the register names the railway or owner of each bridge; many of these girders were supplied through the main contractor for the work.

Longest spans and largest sets.

Seven entries from the register: the longest spans and the largest sets of girders, completed and in hand.

61 m open web girders, road overbridge

Road overbridge on the Mahanadi Coalfields double line flyover between Jharsuguda and Dhutra, South Eastern Railway. The 61.0 m open web girders are the longest span among the completed works. Completed 2025-26, 2026-27.

South Eastern Railway

36 m composite girder, road overbridge

Road overbridge No. 25 in place of level crossing 8 at the Talcher Coalfield of MCL, Angul: one 36 m composite girder span. Completed 2023-24.

East Coast Railway

17 plate girder spans at Asansol

Regirdering of five bridges (656, 691, 637, 640 and 663) in the SAT-JAJ section of Asansol Division: 17 plate girder spans of 18.3 m. Completed 2026-27.

Eastern Railway

12 m wide foot overbridges, Northeast Frontier Railway

Ten spans of 12.0 m wide foot overbridge at six stations: Namrup, Simalguri and Naharkatia in Tinsukia Division (Amrit Bharat Station Scheme), and Fakiragram, Gosaingaon and Kokrajhar in Alipurduar Division, with lifts and a ramp. The other completed foot overbridges are 3.0 m wide. Completed 2025-26, 2026-27.

Northeast Frontier Railway

22 composite girder spans, Brundamal viaducts

Viaducts 1 and 2 of the Brundamal-Jharsuguda flyover: composite girders of 18.3 m (20 spans) and 30.5 m (2 spans), the largest set among the completed works. Completed 2025-26. A 45.7 m open web girder and a 30.5 m composite girder for the same viaducts are ongoing.

East Coast Railway

45 m composite girders, Assam road

Three spans of 45.0 m composite girder on the Sarthebari-Pathsala Road under ASRIP, for the Assam Public Works Department: the longest composite girder among the completed works. Completed 2024-25, 2025-26.

Assam Public Works Department

72 m and 60 m camel back truss girders (ongoing)

The longest spans in the register are still in hand: 72.0 m camel back truss girders on the Lapanga-Rengali road overbridge, Sambalpur Division, and a 60.0 m camel back truss girder on the Kottavalasa-Vizianagaram 4th line. Both are 2026-27.

Ongoing

Register by zone.

Grouped by railway zone. Span and girder counts and years are as written in the register; girder counts are shown as girders × N where a row lists them. NS marks a non-standard girder.

Eastern Railway

5 completed works; 1 ongoing work.

Foot overbridge, Madhupur station, with the Madhupur bypass line

3.0 m wide foot overbridge, 1 span. Foot overbridge. Eastern Railway, Asansol Division.

2024-25 · Completed

Regirdering of Bridges 656 (Up), 691 (Dn), 637, 640 and 663 (Up and Dn), SAT-JAJ section, Asansol Division

18.3 m plate girders × 17. Plate girder bridge. Eastern Railway, Asansol Division.

2026-27 · Completed

Road overbridge in place of level crossing 4/E, Jasidih-Baidyanathdham, Asansol Division

18 m composite girder × 1. Road overbridge. Eastern Railway, Asansol Division.

2018-19 · Completed

Road overbridge in place of level crossing 27/C/E, Shankarpur-Jasidih, Asansol Division

30 m composite girder × 1. Road overbridge. Eastern Railway, Asansol Division.

2018-19 · Completed

Road overbridge in place of level crossing 7/A/T, Chittaranjan-Jamtara, Asansol Division

28.466 m composite girder × 1. Road overbridge. Eastern Railway, Asansol Division.

2018-19 · Completed

Repair of Bridge No. 13 CCR, Dake-BLYG, DDJ-Dake section, with H-beam sleepers

Regirdering of stringers on Bridge No. 13 CCR (the register counts 80). Girder bridge. Eastern Railway, Sealdah Division.

2026-27 · Ongoing

South Eastern Railway

6 completed works; 3 ongoing works.

Foot overbridge with covered shed, Asanboni station

3.0 m wide plate girder foot overbridge, 2 spans. Foot overbridge. South Eastern Railway, Chakradharpur Division.

2023-24 · Completed

Foot overbridge with covered shed, Kunki station

3.0 m wide plate girder foot overbridge, 1 span. Foot overbridge. South Eastern Railway, Chakradharpur Division.

2023-24 · Completed

Foot overbridge, Derowan station yard

3.0 m wide plate girder foot overbridge, 1 span of 16.960 m. Foot overbridge. South Eastern Railway, Chakradharpur Division.

2024-25 · Completed

Foot overbridge with cover shed, Lotapahar station

3.0 m wide plate girder foot overbridge, 1 span (30.610 m + 5.740 m centre to centre). Foot overbridge. South Eastern Railway, Chakradharpur Division.

2024-25 · Completed

Road overbridge, Mahanadi Coalfields double line flyover, Jharsuguda-Dhutra section

61.0 m open web girders × 2. Girder bridge. South Eastern Railway, Chakradharpur Division.

2025-26, 2026-27 · Completed

Mahanadi Coalfields double line flyover, Jharsuguda-Dhutra section

18.3 m composite girders × 4. Girder bridge. South Eastern Railway, Chakradharpur Division.

2025-26 · Completed

Foot overbridges, Purulia yard remodelling, Purulia-Kotshila doubling

6.0 m wide foot overbridge, 2 spans. Foot overbridge. South Eastern Railway, Adra Division.

2025-26 · Ongoing

Elimination of manned level crossings CM-29, CM-22, CM-55 and MH-1 by box pushing, Ranchi Division

20.40 m relieving girders × 2. Plate girder bridge. South Eastern Railway, Ranchi Division.

2026-27 · Ongoing

Santragachi station development, Howrah district: ramps 11, 14 and 15 in the station yard, with a circulating area linking the KONA Expressway

Composite girders for ramps 11, 14 and 15 (the register counts 21). Road overbridge. Ircon International Limited, South Eastern Railway.

2026-27 · Ongoing

Northeast Frontier Railway

3 completed works; 1 ongoing work.

Foot overbridges at Namrup, Simalguri and Naharkatia stations, Amrit Bharat Station Scheme

12.0 m wide foot overbridge, 3 spans. Foot overbridge. Northeast Frontier Railway, Tinsukia Division.

2025-26 · Completed

Foot overbridges and lifts at Fakiragram, Gosaingaon and Kokrajhar stations, with a ramp at Kokrajhar

12.0 m wide foot overbridge, 7 spans. Foot overbridge. Northeast Frontier Railway, Alipurduar Division.

2025-26, 2026-27 · Completed

Foot overbridge, Gorphar station, Katihar-Mukuria doubling

3.0 m wide foot overbridge, 1 span. Foot overbridge. Northeast Frontier Railway, Construction Division.

2025-26 · Completed

Major bridges, Katihar-Mukuria doubling

45.7 m open web girders × 11; 30.5 m composite girders × 2. Girder bridge. Northeast Frontier Railway, Construction Division.

2024-25, 2025-26, 2026-27 · Ongoing

East Coast Railway / South Coast Railway

9 completed works; 7 ongoing works. The register writes this zone as East Coast Railway and, on some rows, as “currently” or “now” South Coast Railway.

Foot overbridge, Sason and Sarla station yards, Sason-Sarla 3rd and 4th line

3.0 m wide foot overbridge, 2 spans. Foot overbridge. East Coast Railway.

2025-26 · Completed

Foot overbridge, Bhalumaska station, Koraput-Singapur Road doubling

3.0 m wide foot overbridge, 1 span. Foot overbridge. East Coast Railway (now South Coast Railway), Waltair Division.

2025-26 · Completed

Major Bridge No. 1205 on an 8 degree curve, Bhansali-Bacheli, KK line

30.5 m composite girders × 4; 12.2 m composite girders × 2. Girder bridge. East Coast Railway (now South Coast Railway), Jagdalpur.

2024-25 · Completed

Bridges on the Sason-Sarla 3rd and 4th line, Jharsuguda-Sambalpur section

18.3 m composite girders × 4; 12.2 m composite girders × 2. Girder bridge. East Coast Railway, Sambalpur Division.

2024-25 · Completed

Bridges on the Sason-Sarla 3rd and 4th line, Jharsuguda-Sambalpur section

18.3 m composite girder × 1; 24.4 m composite girders × 2. Girder bridge. East Coast Railway, Sambalpur Division.

2025-26 · Completed

Viaducts 1 and 2, Brundamal-Jharsuguda flyover connecting the DN line

18.3 m composite girders × 10; 18.3 m composite girders × 10 (NS); 30.5 m composite girders × 2 (NS). Girder bridge. East Coast Railway.

2025-26 · Completed

Road overbridge No. 25 in place of level crossing 8, Talcher Coalfield of MCL

36 m composite girder × 1. Road overbridge. East Coast Railway, Angul.

2023-24 · Completed

Road overbridge over the railway lines, Kirandul

24.0 m composite girder × 1. Road overbridge. NMDC Limited, East Coast Railway.

2025-26 · Completed

Road overbridge over the railway lines, Kirandul

20.40 m composite girder × 1 (non-standard skew girder). Road overbridge. NMDC Limited, East Coast Railway.

2025-26 · Completed

Viaducts 1 and 2, Brundamal-Jharsuguda flyover connecting the DN line

45.7 m open web girder × 1; 30.5 m composite girder × 1. Girder bridge. East Coast Railway.

2026-27 · Ongoing

Flyover between Pendurthy and Simhachalam North

30.5 m composite girders × 36; 30.5 m composite girders × 8 (NS). Girder bridge. East Coast Railway (now South Coast Railway), WAT Division.

2025-26 · Ongoing

3rd and 4th line, Duvvada-Simhachalam North, and doubling, Ore Exchange Complex-Simhachalam North

30.5 m open web girders × 9. Girder bridge. East Coast Railway (now South Coast Railway), Waltair Division.

2025-26 · Ongoing

Bridge No. 8, Sambalpur City to Sarla flyover line

45.7 m open web girders × 2; 18.3 m plate girder × 1. Girder bridge. East Coast Railway, Construction Division.

2026-27 · Ongoing

4th line, Kottavalasa-Vizianagaram

30.5 m open web girders × 5. Girder bridge. South Coast Railway, Waltair Division.

2026-27 · Ongoing

Road overbridge in place of level crossing JT-15, Lapanga-Rengali, Jharsuguda-Titilagarh section

36.0 m composite girders × 2; 18.0 m composite girders × 2; 72.0 m camel back truss girders × 2. Road overbridge. East Coast Railway, Sambalpur Division.

2026-27 · Ongoing

Road overbridge, 4th line, Kottavalasa-Vizianagaram

60.0 m camel back truss girder × 1. Road overbridge. South Coast Railway, Waltair Division.

2026-27 · Ongoing

North Central Railway

2 completed works.

Foot overbridge, Karchana station, Prayagraj to Pt. Deen Dayal Upadhyay Jn. 3rd line

3.0 m wide foot overbridge, girders × 3. Foot overbridge. North Central Railway, Prayagraj Division.

2024-25 · Completed

Foot overbridge, Narayanpur Bazar station yard (Ahraura Road)

3.0 m wide foot overbridge, 1 span. Foot overbridge. North Central Railway.

2024-25 · Completed

South Western Railway

2 completed works.

Foot overbridge over four tracks, Makkajipalli station

3.0 m wide foot overbridge, 1 span of 28.860 m. Foot overbridge. South Western Railway.

Year not stated · Completed

Foot overbridge over four tracks, Nagasamudram station

3.0 m wide foot overbridge, 1 span of 28.860 m. Foot overbridge. South Western Railway.

Year not stated · Completed

East Central Railway

2 completed works.

Foot overbridge, Biharsharif-Barbigha new line

3.0 m wide foot overbridge, 2 spans. Foot overbridge. East Central Railway, Danapur Division.

2024-25 · Completed

Foot overbridges, rail infrastructure of the Buxar Thermal Power Project, Chausa, Buxar, Bihar

3.0 m wide foot overbridge, 9 spans. Foot overbridge. RITES Limited, East Central Railway.

2024-25, 2025-26 · Completed

Other owners

2 completed works; 1 ongoing work. These rows name a body that is not a railway zone: a port corporation, a state public works department and RITES.

Second RCC bridge over the Atharabanko creek near Gate No. 2 of PPA, balance work

30.0 m composite girder × 1. Road overbridge. Indian Port Rail & Ropeway Corporation Limited.

2025-26 · Completed

Sarthebari-Pathsala Road improvement and upgradation, Km 0+000 to Km 17+653, under ASRIP

45.0 m composite girders × 3. Road overbridge. Assam Public Works Department.

2024-25, 2025-26 · Completed

Road overbridge at Dipka Market level crossing, Dipka Area of SECL, Korba (C.G.)

30.0 m composite girders × 7; 36.0 m composite girder × 1. Road overbridge. RITES Limited.

2026-27 · Ongoing

Projects by division.

The named builds of each division, each with its photograph, are on the division’s own projects page. The Railway Bridges projects page has the girders for Eastern Railway, the Government of Sikkim’s 50 m road bridge and the photographs of truss spans in the yard and on site. The Heavy Engineering projects page has thirteen builds, from a 100 MT single-piece cold box to SS304 headers and a machined gearbox housing.