The 31 completed and 13 ongoing bridge girder works in the company’s register, placed on a map of India and listed in full below, with each division’s own projects page linked at the end.
Where we have worked.
Andhra Pradesh
2 completed works
- Foot overbridge over four tracks, Makkajipalli stationMakkajipalli stationYear not statedSouth Western Railway
- Foot overbridge over four tracks, Nagasamudram stationNagasamudram stationYear not statedSouth Western Railway
Assam
3 completed works
- Foot overbridges at Namrup, Simalguri and Naharkatia stations, Amrit Bharat Station SchemeNamrup, Naharkatia and Simalguri stations2025-26Northeast Frontier Railway, Tinsukia Division
- Foot overbridges and lifts at Fakiragram, Gosaingaon and Kokrajhar stations, with a ramp at KokrajharFakiragram, Gosaingaon and Kokrajhar stations2025-26, 2026-27Northeast Frontier Railway, Alipurduar Division
- Sarthebari-Pathsala Road improvement and upgradation, Km 0+000 to Km 17+653, under ASRIPSarthebari-Pathsala road2024-25, 2025-26Assam Public Works Department
Bihar
3 completed works
- Foot overbridge, Biharsharif-Barbigha new lineBarbigha station2024-25East Central Railway, Danapur Division
- Foot overbridges, rail infrastructure of the Buxar Thermal Power Project, Chausa, Buxar, BiharBuxar Thermal Power Project, Chausa2024-25, 2025-26RITES Limited, East Central Railway
- Foot overbridge, Gorphar station, Katihar-Mukuria doublingKatihar-Mukuria doubling, near Gorphar2025-26Northeast Frontier Railway, Construction Division
Chhattisgarh
3 completed works
- Major Bridge No. 1205 on an 8 degree curve, Bhansali-Bacheli, KK lineBhansali-Bacheli, KK line2024-25East Coast Railway (now South Coast Railway), Jagdalpur
- Road overbridge over the railway lines, KirandulKirandul2025-26NMDC Limited, East Coast Railway
- Road overbridge over the railway lines, KirandulKirandul2025-26NMDC Limited, East Coast Railway
Jharkhand
8 completed works
- Foot overbridge with covered shed, Asanboni stationAsanboni station2023-24South Eastern Railway, Chakradharpur Division
- Foot overbridge with covered shed, Kunki stationKunki station2023-24South Eastern Railway, Chakradharpur Division
- Foot overbridge, Derowan station yardDerowan station yard2024-25South Eastern Railway, Chakradharpur Division
- Foot overbridge with cover shed, Lotapahar stationLotapahar station2024-25South Eastern Railway, Chakradharpur Division
- Foot overbridge, Madhupur station, with the Madhupur bypass lineMadhupur station2024-25Eastern Railway, Asansol Division
- Road overbridge in place of level crossing 4/E, Jasidih-Baidyanathdham, Asansol DivisionJasidih-Baidyanathdham2018-19Eastern Railway, Asansol Division
- Road overbridge in place of level crossing 27/C/E, Shankarpur-Jasidih, Asansol DivisionShankarpur-Jasidih2018-19Eastern Railway, Asansol Division
- Road overbridge in place of level crossing 7/A/T, Chittaranjan-Jamtara, Asansol DivisionChittaranjan-Jamtara2018-19Eastern Railway, Asansol Division
Odisha
9 completed works
- Foot overbridge, Sason and Sarla station yards, Sason-Sarla 3rd and 4th lineSason and Sarla station yards2025-26East Coast Railway
- Foot overbridge, Bhalumaska station, Koraput-Singapur Road doublingBhalumaska station2025-26East Coast Railway (now South Coast Railway), Waltair Division
- Bridges on the Sason-Sarla 3rd and 4th line, Jharsuguda-Sambalpur sectionSason-Sarla, Jharsuguda-Sambalpur section2024-25East Coast Railway, Sambalpur Division
- Bridges on the Sason-Sarla 3rd and 4th line, Jharsuguda-Sambalpur sectionSason-Sarla, Jharsuguda-Sambalpur section2025-26East Coast Railway, Sambalpur Division
- Road overbridge, Mahanadi Coalfields double line flyover, Jharsuguda-Dhutra sectionJharsuguda-Dhutra section2025-26, 2026-27South Eastern Railway, Chakradharpur Division
- Mahanadi Coalfields double line flyover, Jharsuguda-Dhutra sectionJharsuguda-Dhutra section2025-26South Eastern Railway, Chakradharpur Division
- Viaducts 1 and 2, Brundamal-Jharsuguda flyover connecting the DN lineBrundamal-Jharsuguda flyover2025-26East Coast Railway
- Road overbridge No. 25 in place of level crossing 8, Talcher Coalfield of MCLTalcher Coalfield2023-24East Coast Railway, Angul
- Second RCC bridge over the Atharabanko creek near Gate No. 2 of PPA, balance workAtharabanko creek near Gate No. 2 of PPA, read as Paradip2025-26Indian Port Rail & Ropeway Corporation Limited
Uttar Pradesh
2 completed works
- Foot overbridge, Karchana station, Prayagraj to Pt. Deen Dayal Upadhyay Jn. 3rd lineKarchana station2024-25North Central Railway, Prayagraj Division
- Foot overbridge, Narayanpur Bazar station yard (Ahraura Road)Narayanpur Bazar station yard (Ahraura Road)2024-25North Central Railway
West Bengal
1 completed work
- Regirdering of Bridges 656 (Up), 691 (Dn), 637, 640 and 663 (Up and Dn), SAT-JAJ section, Asansol DivisionAsansol Division2026-27Eastern Railway, Asansol Division
Andhra Pradesh
4 ongoing works
- Flyover between Pendurthy and Simhachalam NorthPendurthy-Simhachalam North2025-26East Coast Railway (now South Coast Railway), WAT Division
- 3rd and 4th line, Duvvada-Simhachalam North, and doubling, Ore Exchange Complex-Simhachalam NorthDuvvada-Simhachalam North2025-26East Coast Railway (now South Coast Railway), Waltair Division
- 4th line, Kottavalasa-VizianagaramKottavalasa-Vizianagaram 4th line2026-27South Coast Railway, Waltair Division
- Road overbridge, 4th line, Kottavalasa-VizianagaramKottavalasa-Vizianagaram 4th line2026-27South Coast Railway, Waltair Division
Bihar
1 ongoing work
- Major bridges, Katihar-Mukuria doublingKatihar-Mukuria doubling2024-25, 2025-26, 2026-27Northeast Frontier Railway, Construction Division
Chhattisgarh
1 ongoing work
- Road overbridge at Dipka Market level crossing, Dipka Area of SECL, Korba (C.G.)Dipka Market level crossing, Korba2026-27RITES Limited
Jharkhand
1 ongoing work
- Elimination of manned level crossings CM-29, CM-22, CM-55 and MH-1 by box pushing, Ranchi DivisionRanchi Division2026-27South Eastern Railway, Ranchi Division
Odisha
3 ongoing works
- Viaducts 1 and 2, Brundamal-Jharsuguda flyover connecting the DN lineBrundamal-Jharsuguda flyover2026-27East Coast Railway
- Bridge No. 8, Sambalpur City to Sarla flyover lineSambalpur City-Sarla flyover line2026-27East Coast Railway, Construction Division
- Road overbridge in place of level crossing JT-15, Lapanga-Rengali, Jharsuguda-Titilagarh sectionLapanga-Rengali2026-27East Coast Railway, Sambalpur Division
West Bengal
3 ongoing works
- Foot overbridges, Purulia yard remodelling, Purulia-Kotshila doublingPurulia yard2025-26South Eastern Railway, Adra Division
- Repair of Bridge No. 13 CCR, Dake-BLYG, DDJ-Dake section, with H-beam sleepersBridge No. 13 CCR, Dakshineswar-Bally, Kolkata2026-27Eastern Railway, Sealdah Division
- Santragachi station development, Howrah district: ramps 11, 14 and 15 in the station yard, with a circulating area linking the KONA ExpresswaySantragachi station2026-27Ircon International Limited, South Eastern Railway
All 44 works
Completed works (31)
Andhra Pradesh
- Foot overbridge over four tracks, Makkajipalli stationMakkajipalli station, Andhra PradeshYear not statedSouth Western Railway
- Foot overbridge over four tracks, Nagasamudram stationNagasamudram station, Andhra PradeshYear not statedSouth Western Railway
Assam
- Foot overbridges at Namrup, Simalguri and Naharkatia stations, Amrit Bharat Station SchemeNamrup, Naharkatia and Simalguri stations, AssamPlaced at Namrup, one of the three stations named; the exact site is not given.2025-26Northeast Frontier Railway, Tinsukia Division
- Foot overbridges and lifts at Fakiragram, Gosaingaon and Kokrajhar stations, with a ramp at KokrajharFakiragram, Gosaingaon and Kokrajhar stations, Assam2025-26, 2026-27Northeast Frontier Railway, Alipurduar Division
- Sarthebari-Pathsala Road improvement and upgradation, Km 0+000 to Km 17+653, under ASRIPSarthebari-Pathsala road, AssamPlaced midway along the road; the exact site is not given.2024-25, 2025-26Assam Public Works Department
Bihar
- Foot overbridge, Biharsharif-Barbigha new lineBarbigha station, Bihar2024-25East Central Railway, Danapur Division
- Foot overbridges, rail infrastructure of the Buxar Thermal Power Project, Chausa, Buxar, BiharBuxar Thermal Power Project, Chausa, Bihar2024-25, 2025-26RITES Limited, East Central Railway
- Foot overbridge, Gorphar station, Katihar-Mukuria doublingKatihar-Mukuria doubling, near Gorphar, BiharPlaced along the section; the exact site is not given.2025-26Northeast Frontier Railway, Construction Division
Chhattisgarh
- Major Bridge No. 1205 on an 8 degree curve, Bhansali-Bacheli, KK lineBhansali-Bacheli, KK line, Chhattisgarh2024-25East Coast Railway (now South Coast Railway), Jagdalpur
- Road overbridge over the railway lines, KirandulKirandul, Chhattisgarh2025-26NMDC Limited, East Coast Railway
- Road overbridge over the railway lines, KirandulKirandul, Chhattisgarh2025-26NMDC Limited, East Coast Railway
Jharkhand
- Foot overbridge with covered shed, Asanboni stationAsanboni station, Jharkhand2023-24South Eastern Railway, Chakradharpur Division
- Foot overbridge with covered shed, Kunki stationKunki station, Jharkhand2023-24South Eastern Railway, Chakradharpur Division
- Foot overbridge, Derowan station yardDerowan station yard, Jharkhand2024-25South Eastern Railway, Chakradharpur Division
- Foot overbridge with cover shed, Lotapahar stationLotapahar station, Jharkhand2024-25South Eastern Railway, Chakradharpur Division
- Foot overbridge, Madhupur station, with the Madhupur bypass lineMadhupur station, Jharkhand2024-25Eastern Railway, Asansol Division
- Road overbridge in place of level crossing 4/E, Jasidih-Baidyanathdham, Asansol DivisionJasidih-Baidyanathdham, Jharkhand2018-19Eastern Railway, Asansol Division
- Road overbridge in place of level crossing 27/C/E, Shankarpur-Jasidih, Asansol DivisionShankarpur-Jasidih, Jharkhand2018-19Eastern Railway, Asansol Division
- Road overbridge in place of level crossing 7/A/T, Chittaranjan-Jamtara, Asansol DivisionChittaranjan-Jamtara, Jharkhand2018-19Eastern Railway, Asansol Division
Odisha
- Foot overbridge, Sason and Sarla station yards, Sason-Sarla 3rd and 4th lineSason and Sarla station yards, Odisha2025-26East Coast Railway
- Foot overbridge, Bhalumaska station, Koraput-Singapur Road doublingBhalumaska station, Odisha2025-26East Coast Railway (now South Coast Railway), Waltair Division
- Bridges on the Sason-Sarla 3rd and 4th line, Jharsuguda-Sambalpur sectionSason-Sarla, Jharsuguda-Sambalpur section, Odisha2024-25East Coast Railway, Sambalpur Division
- Bridges on the Sason-Sarla 3rd and 4th line, Jharsuguda-Sambalpur sectionSason-Sarla, Jharsuguda-Sambalpur section, Odisha2025-26East Coast Railway, Sambalpur Division
- Road overbridge, Mahanadi Coalfields double line flyover, Jharsuguda-Dhutra sectionJharsuguda-Dhutra section, Odisha2025-26, 2026-27South Eastern Railway, Chakradharpur Division
- Mahanadi Coalfields double line flyover, Jharsuguda-Dhutra sectionJharsuguda-Dhutra section, Odisha2025-26South Eastern Railway, Chakradharpur Division
- Viaducts 1 and 2, Brundamal-Jharsuguda flyover connecting the DN lineBrundamal-Jharsuguda flyover, Odisha2025-26East Coast Railway
- Road overbridge No. 25 in place of level crossing 8, Talcher Coalfield of MCLTalcher Coalfield, Odisha2023-24East Coast Railway, Angul
- Second RCC bridge over the Atharabanko creek near Gate No. 2 of PPA, balance workAtharabanko creek near Gate No. 2 of PPA, read as Paradip, OdishaPlaced approximately; the register does not name the town.2025-26Indian Port Rail & Ropeway Corporation Limited
Uttar Pradesh
- Foot overbridge, Karchana station, Prayagraj to Pt. Deen Dayal Upadhyay Jn. 3rd lineKarchana station, Uttar Pradesh2024-25North Central Railway, Prayagraj Division
- Foot overbridge, Narayanpur Bazar station yard (Ahraura Road)Narayanpur Bazar station yard (Ahraura Road), Uttar Pradesh2024-25North Central Railway
West Bengal
Ongoing works (13)
Andhra Pradesh
- Flyover between Pendurthy and Simhachalam NorthPendurthy-Simhachalam North, Andhra Pradesh2025-26East Coast Railway (now South Coast Railway), WAT Division
- 3rd and 4th line, Duvvada-Simhachalam North, and doubling, Ore Exchange Complex-Simhachalam NorthDuvvada-Simhachalam North, Andhra Pradesh2025-26East Coast Railway (now South Coast Railway), Waltair Division
- 4th line, Kottavalasa-VizianagaramKottavalasa-Vizianagaram 4th line, Andhra PradeshPlaced midway along the section; the exact site is not given.2026-27South Coast Railway, Waltair Division
- Road overbridge, 4th line, Kottavalasa-VizianagaramKottavalasa-Vizianagaram 4th line, Andhra PradeshPlaced midway along the section; the exact site is not given.2026-27South Coast Railway, Waltair Division
Bihar
Chhattisgarh
Jharkhand
Odisha
- Viaducts 1 and 2, Brundamal-Jharsuguda flyover connecting the DN lineBrundamal-Jharsuguda flyover, Odisha2026-27East Coast Railway
- Bridge No. 8, Sambalpur City to Sarla flyover lineSambalpur City-Sarla flyover line, Odisha2026-27East Coast Railway, Construction Division
- Road overbridge in place of level crossing JT-15, Lapanga-Rengali, Jharsuguda-Titilagarh sectionLapanga-Rengali, Odisha2026-27East Coast Railway, Sambalpur Division
West Bengal
- Foot overbridges, Purulia yard remodelling, Purulia-Kotshila doublingPurulia yard, West Bengal2025-26South Eastern Railway, Adra Division
- Repair of Bridge No. 13 CCR, Dake-BLYG, DDJ-Dake section, with H-beam sleepersBridge No. 13 CCR, Dakshineswar-Bally, Kolkata, West Bengal2026-27Eastern Railway, Sealdah Division
- Santragachi station development, Howrah district: ramps 11, 14 and 15 in the station yard, with a circulating area linking the KONA ExpresswaySantragachi station, West Bengal2026-27Ircon International Limited, South Eastern Railway
Bridge girder works, completed and ongoing.
From the company’s register of railway spans: the foot overbridges, road overbridges and bridge girders fabricated by Metal Craft, on works of zonal railways, railway undertakings and state bodies.
Metal Craft Engineering of Kolkata keeps a register of its railway bridge works. It lists 31 completed works on 27 projects (some projects have more than one entry): 16 foot overbridge (FOB) works, 8 road overbridge (ROB) works, 6 girder bridge works and one plate girder regirdering job. They lie in seven railway zones: Eastern, South Eastern, Northeast Frontier, East Coast (now South Coast), North Central, South Western and East Central. They also include works of RITES, NMDC, the Indian Port Rail & Ropeway Corporation and the Assam Public Works Department. Years of execution run from 2018-19 to 2026-27. The ongoing works are listed after the completed ones in each group. Each row below names the railway or body that owns the bridge, with the girders listed under it.
For railway works, the register names the railway or owner of each bridge; many of these girders were supplied through the main contractor for the work.
Longest spans and largest sets.
Seven entries from the register: the longest spans and the largest sets of girders, completed and in hand.
61 m open web girders, road overbridge
Road overbridge on the Mahanadi Coalfields double line flyover between Jharsuguda and Dhutra, South Eastern Railway. The 61.0 m open web girders are the longest span among the completed works. Completed 2025-26, 2026-27.
36 m composite girder, road overbridge
Road overbridge No. 25 in place of level crossing 8 at the Talcher Coalfield of MCL, Angul: one 36 m composite girder span. Completed 2023-24.
17 plate girder spans at Asansol
Regirdering of five bridges (656, 691, 637, 640 and 663) in the SAT-JAJ section of Asansol Division: 17 plate girder spans of 18.3 m. Completed 2026-27.
12 m wide foot overbridges, Northeast Frontier Railway
Ten spans of 12.0 m wide foot overbridge at six stations: Namrup, Simalguri and Naharkatia in Tinsukia Division (Amrit Bharat Station Scheme), and Fakiragram, Gosaingaon and Kokrajhar in Alipurduar Division, with lifts and a ramp. The other completed foot overbridges are 3.0 m wide. Completed 2025-26, 2026-27.
22 composite girder spans, Brundamal viaducts
Viaducts 1 and 2 of the Brundamal-Jharsuguda flyover: composite girders of 18.3 m (20 spans) and 30.5 m (2 spans), the largest set among the completed works. Completed 2025-26. A 45.7 m open web girder and a 30.5 m composite girder for the same viaducts are ongoing.
45 m composite girders, Assam road
Three spans of 45.0 m composite girder on the Sarthebari-Pathsala Road under ASRIP, for the Assam Public Works Department: the longest composite girder among the completed works. Completed 2024-25, 2025-26.
72 m and 60 m camel back truss girders (ongoing)
The longest spans in the register are still in hand: 72.0 m camel back truss girders on the Lapanga-Rengali road overbridge, Sambalpur Division, and a 60.0 m camel back truss girder on the Kottavalasa-Vizianagaram 4th line. Both are 2026-27.
Register by zone.
Grouped by railway zone. Span and girder counts and years are as written in the register; girder counts are shown as girders × N where a row lists them. NS marks a non-standard girder.
Eastern Railway
5 completed works; 1 ongoing work.
Foot overbridge, Madhupur station, with the Madhupur bypass line
3.0 m wide foot overbridge, 1 span. Foot overbridge. Eastern Railway, Asansol Division.
Regirdering of Bridges 656 (Up), 691 (Dn), 637, 640 and 663 (Up and Dn), SAT-JAJ section, Asansol Division
18.3 m plate girders × 17. Plate girder bridge. Eastern Railway, Asansol Division.
Road overbridge in place of level crossing 4/E, Jasidih-Baidyanathdham, Asansol Division
18 m composite girder × 1. Road overbridge. Eastern Railway, Asansol Division.
Road overbridge in place of level crossing 27/C/E, Shankarpur-Jasidih, Asansol Division
30 m composite girder × 1. Road overbridge. Eastern Railway, Asansol Division.
Road overbridge in place of level crossing 7/A/T, Chittaranjan-Jamtara, Asansol Division
28.466 m composite girder × 1. Road overbridge. Eastern Railway, Asansol Division.
Repair of Bridge No. 13 CCR, Dake-BLYG, DDJ-Dake section, with H-beam sleepers
Regirdering of stringers on Bridge No. 13 CCR (the register counts 80). Girder bridge. Eastern Railway, Sealdah Division.
South Eastern Railway
6 completed works; 3 ongoing works.
Foot overbridge with covered shed, Asanboni station
3.0 m wide plate girder foot overbridge, 2 spans. Foot overbridge. South Eastern Railway, Chakradharpur Division.
Foot overbridge with covered shed, Kunki station
3.0 m wide plate girder foot overbridge, 1 span. Foot overbridge. South Eastern Railway, Chakradharpur Division.
Foot overbridge, Derowan station yard
3.0 m wide plate girder foot overbridge, 1 span of 16.960 m. Foot overbridge. South Eastern Railway, Chakradharpur Division.
Foot overbridge with cover shed, Lotapahar station
3.0 m wide plate girder foot overbridge, 1 span (30.610 m + 5.740 m centre to centre). Foot overbridge. South Eastern Railway, Chakradharpur Division.
Road overbridge, Mahanadi Coalfields double line flyover, Jharsuguda-Dhutra section
61.0 m open web girders × 2. Girder bridge. South Eastern Railway, Chakradharpur Division.
Mahanadi Coalfields double line flyover, Jharsuguda-Dhutra section
18.3 m composite girders × 4. Girder bridge. South Eastern Railway, Chakradharpur Division.
Foot overbridges, Purulia yard remodelling, Purulia-Kotshila doubling
6.0 m wide foot overbridge, 2 spans. Foot overbridge. South Eastern Railway, Adra Division.
Elimination of manned level crossings CM-29, CM-22, CM-55 and MH-1 by box pushing, Ranchi Division
20.40 m relieving girders × 2. Plate girder bridge. South Eastern Railway, Ranchi Division.
Santragachi station development, Howrah district: ramps 11, 14 and 15 in the station yard, with a circulating area linking the KONA Expressway
Composite girders for ramps 11, 14 and 15 (the register counts 21). Road overbridge. Ircon International Limited, South Eastern Railway.
Northeast Frontier Railway
3 completed works; 1 ongoing work.
Foot overbridges at Namrup, Simalguri and Naharkatia stations, Amrit Bharat Station Scheme
12.0 m wide foot overbridge, 3 spans. Foot overbridge. Northeast Frontier Railway, Tinsukia Division.
Foot overbridges and lifts at Fakiragram, Gosaingaon and Kokrajhar stations, with a ramp at Kokrajhar
12.0 m wide foot overbridge, 7 spans. Foot overbridge. Northeast Frontier Railway, Alipurduar Division.
Foot overbridge, Gorphar station, Katihar-Mukuria doubling
3.0 m wide foot overbridge, 1 span. Foot overbridge. Northeast Frontier Railway, Construction Division.
Major bridges, Katihar-Mukuria doubling
45.7 m open web girders × 11; 30.5 m composite girders × 2. Girder bridge. Northeast Frontier Railway, Construction Division.
East Coast Railway / South Coast Railway
9 completed works; 7 ongoing works. The register writes this zone as East Coast Railway and, on some rows, as “currently” or “now” South Coast Railway.
Foot overbridge, Sason and Sarla station yards, Sason-Sarla 3rd and 4th line
3.0 m wide foot overbridge, 2 spans. Foot overbridge. East Coast Railway.
Foot overbridge, Bhalumaska station, Koraput-Singapur Road doubling
3.0 m wide foot overbridge, 1 span. Foot overbridge. East Coast Railway (now South Coast Railway), Waltair Division.
Major Bridge No. 1205 on an 8 degree curve, Bhansali-Bacheli, KK line
30.5 m composite girders × 4; 12.2 m composite girders × 2. Girder bridge. East Coast Railway (now South Coast Railway), Jagdalpur.
Bridges on the Sason-Sarla 3rd and 4th line, Jharsuguda-Sambalpur section
18.3 m composite girders × 4; 12.2 m composite girders × 2. Girder bridge. East Coast Railway, Sambalpur Division.
Bridges on the Sason-Sarla 3rd and 4th line, Jharsuguda-Sambalpur section
18.3 m composite girder × 1; 24.4 m composite girders × 2. Girder bridge. East Coast Railway, Sambalpur Division.
Viaducts 1 and 2, Brundamal-Jharsuguda flyover connecting the DN line
18.3 m composite girders × 10; 18.3 m composite girders × 10 (NS); 30.5 m composite girders × 2 (NS). Girder bridge. East Coast Railway.
Road overbridge No. 25 in place of level crossing 8, Talcher Coalfield of MCL
36 m composite girder × 1. Road overbridge. East Coast Railway, Angul.
Road overbridge over the railway lines, Kirandul
24.0 m composite girder × 1. Road overbridge. NMDC Limited, East Coast Railway.
Road overbridge over the railway lines, Kirandul
20.40 m composite girder × 1 (non-standard skew girder). Road overbridge. NMDC Limited, East Coast Railway.
Viaducts 1 and 2, Brundamal-Jharsuguda flyover connecting the DN line
45.7 m open web girder × 1; 30.5 m composite girder × 1. Girder bridge. East Coast Railway.
Flyover between Pendurthy and Simhachalam North
30.5 m composite girders × 36; 30.5 m composite girders × 8 (NS). Girder bridge. East Coast Railway (now South Coast Railway), WAT Division.
3rd and 4th line, Duvvada-Simhachalam North, and doubling, Ore Exchange Complex-Simhachalam North
30.5 m open web girders × 9. Girder bridge. East Coast Railway (now South Coast Railway), Waltair Division.
Bridge No. 8, Sambalpur City to Sarla flyover line
45.7 m open web girders × 2; 18.3 m plate girder × 1. Girder bridge. East Coast Railway, Construction Division.
4th line, Kottavalasa-Vizianagaram
30.5 m open web girders × 5. Girder bridge. South Coast Railway, Waltair Division.
Road overbridge in place of level crossing JT-15, Lapanga-Rengali, Jharsuguda-Titilagarh section
36.0 m composite girders × 2; 18.0 m composite girders × 2; 72.0 m camel back truss girders × 2. Road overbridge. East Coast Railway, Sambalpur Division.
Road overbridge, 4th line, Kottavalasa-Vizianagaram
60.0 m camel back truss girder × 1. Road overbridge. South Coast Railway, Waltair Division.
North Central Railway
2 completed works.
Foot overbridge, Karchana station, Prayagraj to Pt. Deen Dayal Upadhyay Jn. 3rd line
3.0 m wide foot overbridge, girders × 3. Foot overbridge. North Central Railway, Prayagraj Division.
Foot overbridge, Narayanpur Bazar station yard (Ahraura Road)
3.0 m wide foot overbridge, 1 span. Foot overbridge. North Central Railway.
South Western Railway
2 completed works.
Foot overbridge over four tracks, Makkajipalli station
3.0 m wide foot overbridge, 1 span of 28.860 m. Foot overbridge. South Western Railway.
Foot overbridge over four tracks, Nagasamudram station
3.0 m wide foot overbridge, 1 span of 28.860 m. Foot overbridge. South Western Railway.
East Central Railway
2 completed works.
Foot overbridge, Biharsharif-Barbigha new line
3.0 m wide foot overbridge, 2 spans. Foot overbridge. East Central Railway, Danapur Division.
Foot overbridges, rail infrastructure of the Buxar Thermal Power Project, Chausa, Buxar, Bihar
3.0 m wide foot overbridge, 9 spans. Foot overbridge. RITES Limited, East Central Railway.
Other owners
2 completed works; 1 ongoing work. These rows name a body that is not a railway zone: a port corporation, a state public works department and RITES.
Second RCC bridge over the Atharabanko creek near Gate No. 2 of PPA, balance work
30.0 m composite girder × 1. Road overbridge. Indian Port Rail & Ropeway Corporation Limited.
Sarthebari-Pathsala Road improvement and upgradation, Km 0+000 to Km 17+653, under ASRIP
45.0 m composite girders × 3. Road overbridge. Assam Public Works Department.
Road overbridge at Dipka Market level crossing, Dipka Area of SECL, Korba (C.G.)
30.0 m composite girders × 7; 36.0 m composite girder × 1. Road overbridge. RITES Limited.
Projects by division.
The named builds of each division, each with its photograph, are on the division’s own projects page. The Railway Bridges projects page has the girders for Eastern Railway, the Government of Sikkim’s 50 m road bridge and the photographs of truss spans in the yard and on site. The Heavy Engineering projects page has thirteen builds, from a 100 MT single-piece cold box to SS304 headers and a machined gearbox housing.